123 Albert Street

Project Number
A080834
 
Designer
Anthony Freeman
 
Client
Planet Plumbing
Architect
Hassell Architects
Builder
Laing O'Rourke
Value (Build Cost)
$ 359 Million
Hydraulics Contractor(s)
Planet Plumbing

Project Duration
August 2008 to July 2011
 
Innovations
The first premium grade tower in Brisbane to achieve 6 star Green Star
 
Grey water from waste fixtures was treated and re-cycled for irrigation
 
Rain water was harvested for WC flushing, wash down and irrigation
 
The gas supply was designed to power a tri-generation energy system
Specific Challenges
This project was the first to be documented in Revit by Aqualogical

Extensve water and energy usage reporting, calculations and strategies to assist with achieveing the 6 star Green Star accreditation
Services Documented
  • Cold Water Service,
  • Hot Water Service,
  • Fire Hydrant Service,
  • Fire Hose Reel Service,
  • Gas Service,
  • Sanitary Drainage and Plumbing,
  • Downpipes and Gutters
  • Stormwater Drainage

Aqualogical | Hydraulic Consultants